Project Description
Milton Fire Station 85
With the area continuing to grow, the Milton Fire Department sought to expand station #85 to keep pace with the influx of emergency calls. The Milton Fire Department contracted DBF to study the existing fire station to determine the maximum footprint achievable. A feasibility study was conducted which determined that renovating the existing property was the most cost-effective option due to the station’s central location.
The renovation and addition of the firehouse doubled the square footage of the original station from 12,422 SF to 26,132 SF and incorporated a sloped gable roof to replace the existing flat roof. The firehouse encompasses an enlarged engine bay that holds four pieces of equipment; a new engine bay to hold two additional apparatuses; new bunk rooms, training rooms, and restrooms; laundry, recreational, and kitchen accommodations for volunteer firefighters, and paid EMS staff; as well as new administrative offices.
DBF provided full-service architecture, civil and structural engineering, and surveying services for this project.
Location:
Milton, Delaware
Client:
Milton Fire Department
Services Provided:
Architecture, Engineering, Surveying
STAY CONNECTED
Join our mailing list to receive the
latest news and updates about our firm!
By submitting this form, you are consenting to receive marketing emails from: . You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact